Project :

POST TENSION ANCHORING OF MOHINI PICK-UP WEIR

 

POST TENSION ANCHORING TO COUNTERACT ADDITIONAL TENSILE STRESS

Client : WATER RESOURCES DEPARTMENT, GOVERNMENT OF MADHYA PRADESH
Location : 36 KM FROM SHIVPURI (M.P.), INDIA
Details  
Mohini pick-up weir has been converted into an impounding reservoir by providing 30 feet high radial gates over the crest of existing weir. To counteract the additional tensile stresses, developing due to increase in height of structure, it became imperative to install pre-stressed anchors from top of weir to ensure stability of structure.
The work comprises of installation of 122 Nos. of 75 Tons anchors, which pass through body of dam and are anchored in foundation rock at sufficient depth. The maximum length of anchors was 36 meter including 7 meter in rock, Each Tendon comprises of 7 numbers of 12.7 mm nominal diameter P.C. strand wire, Class-II. These anchors, designed for as long a life as that of the dam, have been minutely protected against corrosion.
To View other selected works, Please Click Here
Kaketo Dam Pagara Dam Tighra Dam Tillar Dam Aoda Dam
Besides these, we have completed many more such projects. Further details can be seen in company’s office at Indore.
©2008, All Rights Reserved, Ferro Concrete Construction (I) Pvt. Ltd.d